We are leading the way looking ahead

The valuable Partner for a profitable Biogas plant

Our services

Development of New Biogas Projects

We develop Biogas Projects from the beginning till their start up.

Biogas Plant Performance Optimization

We provide Consulting Services to improve the performance of the plant.

Development of Biomethane Projects

We provide Consulting Services for Biogas upgrading and Biomethane production, either for fuel (CNG) or for injection into the Natural Gas Network.

Contact us

There is no Small or Big Biogas Project. They all work with the same rules of biology

As experts in biomass energy production, at INNERA we work to bring you innovative products and holistic solutions – from substrate preparation and laboratory explanations to digester biology. We don’t promise, we respond!

Partners of the German biotechnology company SCHAUMANN Bioenergy, we study in depth every disturbance of the anaerobic process, through sample analyses, raw material analyses, inhibition tests, biogas potential tests, silage analyses, and suggest the necessary changes of operational parameters of the plant or additional products to streamline the process.

YEARS OF EXPERIENCE IN BIOGAS

SERVICED BIOGAS UNITS

ASSOCIATED BIOMETHANE UNIT

CONSULTING SERVICES PROJECTS

Indicative projects

Biogas 500 kW

  • Stabilization of biogas production and increase of methane (from 55% to 60%) by adding suitable trace elements customized blend.
  • Dilution of the floating layer by adding in the recipe of the trace elements a specialized product.

Biogas 500 kW

  • Transition from mesophilic to thermophilic process (55 C) in two months.
  • Increasing biogas production to yield 1000 kW from 500 kW with the same Digester (single stage digestion).
  • Stabilization of production using trace elements.

Biogas 1 MW

Detection of leaks in the Digester and piping/connection areas using a thermo-camera.

We have been dealing with Biogas Projects for more 10 Years

We early access any situation that may occur in the biogas plant and shortly suggest the most suitable solutions in order to stabilize the operation. We use all means that provide information/data to us, such as analyses of samples of the Digester, of the raw materials, as well as videos/photos of the exact picture of the situation in the biogas plant.

Additionally, we visit the plant on site on a regular basis.

Call us:

+30 210 9646445

Are you experiencing any of the following problems with your plant?

Don’t let the problem further develop and lose valuable days of your production. It is for your benefit to seek our assistance immediately, before the damage extends further inside your Digester. Most of the problems and disorders of the biological process, can be avoided with preventive actions. Contact us to learn more.

Do you notice a drop in daily biogas production, while you haven't changed anything in the feed?

Check pH and FOS/TAC. Measure the Ammonium concentration. Check the temperature inside the Digester. If all of the above is normal, please contact us.

Do you notice a sudden drop in methane %?

Check the Ammonium nitrogen and do an acid analysis. Contact us.

Are you experiencing a foaming issue?

Take photos and videos and send them to us. From the type of blister in the first stage, we can conclude about the possible cause of foaming. A complete analysis in the laboratory will give us more information about the cause of the foaming.

Do you notice an increase in hydrogen sulphide in your biogas?

Check the Oxygen % in your biogas. Check the stirring system. Contact us.

Contact us

+30 210 9646445

info@innera.gr